Twin Towers DEP Lab Complex

Boiler Replacement – Tallahassee, FL, 2013, Design and CA for DMS project for the replacement and controls upgrades to the buildings boiler plan, new units were two 2,500 MBH condensing boilers. Project Cost: $120,000

100% OA AHU-1 Renovations – Tallahassee FL, 2014, complete renovation to an existing 50,000 CFM 100% OA Hydronic Air Handling unit including new coils, fan, controls, pipe connections, casing refurbishing etc. The unit was critical to the operation of the existing labs and had to stay functional the entire time during construction. Project cost: $500,000.

Re-Roofing – Tallahassee, FL, 2013, replace the facilities roof and demolish unused mechanical penthouse and equipment including chillers, pumps, piping, and cooling towers. Provide new HVAC Split System.