Grasslands

Lecia

Date Posted - 8th Aug 2015 |  Category - Projects

grasslands_3923grasslands_3927grasslands_3925

Grasslands Brewing

Renovation of old warehouse space into a brewery and bar. MPE was responsible for engineering the brewery equipment connections, glycol system, steam system, boiler requirements, chiller requirements, bar/tasting room environmental control, brewery trench and other drainage as well as the 180F/140F/120F and filtered DCW distribution.